Individual capacities in work centers R/3

0 Kudos

Hi,

does anyone know why I can't manage to CIF work centers from R/3 with individual capacities to APO ?

Are there functionalities available in APO where resources with multiple individual capacities are used ?

Thanks for any info.

Regards,

Kristof.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Kristof,

1) As mentioned by mohan, you need to define your settings in CFC9

for resources

2) In ECC work center, under number of individual capacities as

multiple numbers as per your requirement to classify the work

centre as multiple which will be used during ciffing.

3) Under APO resource tab, you need to define whether SNP

relevant or not (accordingly, the system decides the work

centre to be considered as multiactivity or multimixed resource)

4) Also check the below link for integration of resources whether

all the relevant settings are maintained for ciffing to ensure proper

ciffing.

http://help.sap.com/saphelp_scm70/helpdata/EN/3a/d5d83773c3522be10000009b38f842/frameset.htm

Regards

R. Senthil Mareeswaran.

Former Member
0 Kudos

Hi,

When you CIF workcenter with number individual capacity more than one and can be used by sevral operations. Systems CIFs it as multi mixed resource. In time continuous tab you will get nuber of capacity as whatever maintained in ECC.

System allows to schedule number activites at at time= number of individual capacitys if you do finite scheduling with finite scheduling strategy.

Regards,

Santosh

Former Member
0 Kudos

Hi, make sure your capacity record in ECC is set up with the "Relevant to finite scheduling" flag set and if required the "Can be used by several operations" flag which defines a multi mixed resource.

Laurence

0 Kudos

Hi,

both the flags 'Can be used by several operations' and 'relevant to finite scheduling' are flagged. Any other ideas ?

Regards,

Kristof.

Former Member
0 Kudos

Hi Christof,

I think there is no direct way of working with the Individual capacities in APO. But you can still work with capacity available in ECC by transferring the workcentre capacities as external capacities. You might consider to generate the capacities in ECC rather than the usual method of generating the capacities in APO. For this you have to chose option 'X' or 'A' for Use External Capacity indicator in CFC9 in ECC and also set the External Capacity Indicator for the APO data in the capacity header data in ECC so that system generates the capacities in ECC and use them in APO.

Hope that helps.

rgds,

Mohan

Former Member
0 Kudos

Hi,

We can use the Core Interface (CIF) to transfer work centers from the R/3 system to SAP APO. In SAP APO, the system creates resources for each capacity category of the work center (such as employee or machine).

In SAP R/3, we can define parameters (such as the resource category), which are not available in SAP R/3 but which are required in SAP APO. We can also include them in the first capacity transfer.

Hope this gives insight.

Regards

Datta

0 Kudos

Hi,

thanks for this quick answer. However, I would like to work with different individual capacities on one capacity category (machine) on a work center. In R/3 these are defined via the detail screen of the capacity category (in my case 001 Machine), and then choose 'Go to -> individual capacities'.

Any idea how this could be CIFfed ?

Thanks for any input !

Kristof.