Quality Inspection stock not taken into consideration for MRP

313 Views

All,

We have an issue while testing our system....

When we look at a particular stock (lets say material A), it has stock in unrestrcited (say 100) and quality inspection (say 200)... However, MRP is only reconigizing the unrestricted stock (of 100) and not the quality inspection... Therefore, we will continous order being made via MRP until the quality inspection is moved.

Normally, stock is not in quality inspection that long (say 1 to 2 hours), but in some cases it can go a few days... IS there any configuration point or setting in material master that makes sure MRP will calculation both stock so this does not happen?