Good morning alltogether,
I have some problems with MD01.
I configured a material with
MRP type = V1 Reorder point = 5 Lot size = EX Minimum Lot size = 10
Then I did a MD01.
Afterwards I did MD06 and got a list of all materials for that plant, not just the ones which have to be purchased/ordered.
When I looked into ME57 I just got 1 new purRqs after MD01. That's fine!!!
I'm wondering why MD06 and MDLD shows all materials where there is no need to reorder???
Am I doing something wrong? I would like to have a mrp list as result with the materials to be ordered.
Same for MDLD.
Does someone could help me out ?
Thanks in advance.