For a given material master we want to record different costs and lead times for cover the following:
New Part
Repair - Minor
Repair - Major
How can this be mastered in SAP. We don't want to create extended plants on the masterial master for the repair items.
I have considered split valuation, but the planned leadtime on the MRP2 tab defaults to the same value for each split valuation type.
Parts can be bought from different vendors, so I don't think a PIR is the answer.
Regards