Planned orders are coming for phantom assembly

Former Member
0 Kudos

Hi Experts,

I am facing one issue with phantom assembly. I have one FG X in which i have "Y" SFG as a phantom assembly which is having some raw materials. Now I have set the 50 Spl Procurement key in the MM of SFG "Y" but when i run the MRP for FG "X" it is not transferring the requirements to the raw material of "Y" phantom. means "Y" material is not exploding the BOM.

What could be the reasons? where I am missing? Please help to resolve this.

Regards

Deepak Sharma

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi dear,

check the spl proc. key 50 in IMG whether phantom item selected.

regards

vinoth

Former Member
0 Kudos

Hi dear,

Everything is ok. 50 is also having phantom check.

Former Member
0 Kudos

Hi,

Few checks:

1. Open BOM of X & check if you have maintained any spl proc key for Y in BOM line item, if yes, blank it out

2. Check the validity dates of the BOM of X, it should be valid atleast a day before the need date

3. Double check that the demand is being placed for X i.e. the parent & not directly at Y

Regards,

Vivek

Former Member
0 Kudos

Hi Vivek,

Answers to your ques. :

1. I want to use 50 in BOM for phantom assembly instead from material master. Means I will put 50 for "Y" in the BOM of "X" in the item detail. Because this "Y" can be used in other FG also in which I don't want "Y" as a phantom.

2. Validity of the "X" BOm is also ok.

3. The demand is at "X" level.

Regards

Deepak Sharma

Former Member
0 Kudos

Hi,

Flagging 50 in BOM item is fine, but ensure the BOM of Y is valid as well.

Do a simulation MRP run via MD02 & check if the BOM is exploding for Y, if it is not, then the BOM is not valid due to some reason, so verify the same. It should give you a clue.

Regards,

Vivek

Answers (1)

Answers (1)

Anupam1143
Active Contributor
0 Kudos

HI

Check In T code OS17 explosion types for the bom deselect the phantom assembly check box and then check

Regards

Anupam Sharma

Former Member
0 Kudos

Dear Anupam,

In OS17 the check box for phantom assembly is already ticked . Do I need to put this explosion type in BOM in component details? I have not used yet but when i use it it explodes the BOM and gives the planned orders for "y" phantom assembly also. I don't want planned orders for "Y" but requirements for its components. and when I don't use the explasion type then system doesn't give the planned orders for phantom but no for component also. means requirements are not getting transferred to the phantom assembliy's components.

Regards

Deepak sharma