Hi Experts,
I am facing one issue with phantom assembly. I have one FG X in which i have "Y" SFG as a phantom assembly which is having some raw materials. Now I have set the 50 Spl Procurement key in the MM of SFG "Y" but when i run the MRP for FG "X" it is not transferring the requirements to the raw material of "Y" phantom. means "Y" material is not exploding the BOM.
What could be the reasons? where I am missing? Please help to resolve this.
Regards
Deepak Sharma
Hi dear,
check the spl proc. key 50 in IMG whether phantom item selected.
regards
vinoth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Few checks:
1. Open BOM of X & check if you have maintained any spl proc key for Y in BOM line item, if yes, blank it out
2. Check the validity dates of the BOM of X, it should be valid atleast a day before the need date
3. Double check that the demand is being placed for X i.e. the parent & not directly at Y
Regards,
Vivek
Hi Vivek,
Answers to your ques. :
1. I want to use 50 in BOM for phantom assembly instead from material master. Means I will put 50 for "Y" in the BOM of "X" in the item detail. Because this "Y" can be used in other FG also in which I don't want "Y" as a phantom.
2. Validity of the "X" BOm is also ok.
3. The demand is at "X" level.
Regards
Deepak Sharma
HI
Check In T code OS17 explosion types for the bom deselect the phantom assembly check box and then check
Regards
Anupam Sharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Anupam,
In OS17 the check box for phantom assembly is already ticked . Do I need to put this explosion type in BOM in component details? I have not used yet but when i use it it explodes the BOM and gives the planned orders for "y" phantom assembly also. I don't want planned orders for "Y" but requirements for its components. and when I don't use the explasion type then system doesn't give the planned orders for phantom but no for component also. means requirements are not getting transferred to the phantom assembliy's components.
Regards
Deepak sharma
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.