Skip to Content
0
Former Member
May 06, 2010 at 03:05 PM

Automatic Batch determination in MIGO for IM movements/GI/TF Postings

173 Views

I have configured batch determination to use SLED for batches in Ascending Order.

GRs have been done for 2 batches, one with SLED a day earlier than the other.

Now,

I know there is some auto batch determination for SD documents, but I want batch suggestions for IM Movements.

I am trying to post 301 transfer to another plant, and it asks ME to enter the batch.

How can I make the system propose the desired batch (earlier SLED) automatically?

Thanks.