Dear Gurus<

I am facing a problem, during GR of WIP batch.

1 production order has 4 operation, During 1st operation I make GR 50 Qty of WIP_B_1 using total Raw material,

During Confirmation of 2nd operation I want to GR 20 Qty WIP_B_2 using 20 WIP_B_1.

but sytem consumes total Qty of WIP_B_1 (i.e 50 Qty).

Is it possible to use partial qty of WIP batch in the intermediate operation???? Also provide some document for WIP batch if available.

Please help me.

Thanks in Advance.

Sitaram Mondal

Accepted Solutions (1)

Accepted Solutions (1)

madlercm
Active Contributor
0 Kudos

Hi,

I'm sure that I understand what you are doing, but in SAP WIP is not a material (like you have WIP_B_1).

If you want to work your way, then you end up having not 1 production order with 4 operations, but 4 production orders with 1 operation each!

Regards,

Mario

Former Member
0 Kudos

Thank you sir,

Can u provide some document regarding WIP Batch.

Regards.

Sitaram.