Skip to Content
0
Jan 17, 2019 at 12:23 AM

Load Fuel cost to material

56 Views

Dear Expert

We do material transfer from plant A to plant B via STO.

In the STO we have added condition type for transport cost and loading charges.

Sometimes we issue fuel to driver and this is good issue via cost center in MIGO. there is no link with the STO.

Is there a way to issue the Fuel againts that STO or how can we add fuel cost to the material cost ?

Thanks in advance