Skip to Content
0
Former Member
May 04, 2010 at 02:15 PM

Technical System not updated to satellite SLD via SLD Data Supplier Bridge

304 Views

Hello Kolleagues,

we have a landscape with 4 SLD's (Development, Pre-Integration, Integration and Production).

The Master SLD is configured on the PI System at Production.

The Data Supplier Bridge on PI Production synchronized SLD content, like technical systems, to the connected non production SLD's. This is the theory.

In fact the technical system replication to the SLD in Development, Pre-Integration and Integration doesn't work.

What is the problem? How can I fix that?

Many thanks in advance!

Jochen