Skip to Content
0
Former Member
Apr 28, 2010 at 04:30 AM

dynamic date range in the variant

161 Views

Hi,

We have a background job that is scheduled to run on every 25th. One step of the job has a selection screen which has a Payment date range which is to have the dates 25th of previous to the 24th of the current month.

So every month this needs to be updated dynamically. For ex: If I look at the variant of the step of the job in period 04 the date should be "03/25/2010 to 04/24/2010". If I look in Period 05 then it should be "04/25/2010 to 04/25/2010".

Can anyone tell me if this can be achieved through a variant or does this have to be put in the code?

Regards,

raj/