Hi

We refresh the data in ecc and need to reload in BI, delta init is alread configure before the data refresh, should i go to into the infopackage and delete the init and run again delta init or run the repair request and load the data into the PSA.

Please help me to understand this problem,

Thanks,

Pria

Accepted Solutions (1)

Accepted Solutions (1)

mr_v
Active Contributor
0 Kudos

Not sure what do u mean by data refresh in ECC.

If u deleted unwanted data records in ECC, and u wanted to delete these from BI (that got loaded through INIT) then u can do complete delete from Cube/DSO, and run fresh INIT load again. To delete initial init request.. double click infopackage. from menu scheduler -> Initialization option for source system.. select thta init request and delete.

If u updated and/or added any existing data records in ECC, and existing records in BI (that got loaded through INIT) are still valid, then u can create separate infopackage for delta and do delta load in BI. In this case no need to delete Init request

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Pria,

Is there an ODS in the flow and if yes, what is the mode of the key figures :summation or overwrite.

Regards.

Former Member
0 Kudos

Please any comments