cancel
Showing results for 
Search instead for 
Did you mean: 

product allocation and ATP

Former Member
0 Kudos

Hi,

Are there any best practices for running product allocation before/after ATP ? When is allocation to be run before ATP and when should it be run after ATP ?

Thanks

GS

Accepted Solutions (1)

Accepted Solutions (1)

pavan_verma2
Contributor
0 Kudos

Hi ,

Availability check and Product allocation are defined in check instructions as step 1 and step 2.

If Business needs product allocation then it can be combined with availability check as step 2.

Most of the companies use Availability check as first step then product allocation in check instructions.

Thanks,

Pavan Verma

Answers (0)