ACTUAL overhead calculation on production orders

Former Member
0 Kudos

Hi

I defined the percentage for actual o/h in KZZ2. I have doubts on how the base works.

Now the Base ie the cost elements on which percentage is calculated is same for both plan and actual. eg. Material is 510000. When calculating the actual overhead, what base amount does system use.......... 1) the actual material confirmed Or 2) the value of standard qty

Thanks

kamala

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

all the posted value for the cost elements defined in the base is used for overhead calculation, no matter how it is posted (form logistics, from FI,...)

Best regards, Christian