Dear All,
We want to control and document Changes that are being made in the Material Master Records MRP Tab. For this, Evertime a user request to us to change the Material Master Records MRP Type or Reorder level (minimum/maximum), we will give them a MRP change form signed by their Manager and from here we will change the Material Master Record according to their request and at the same time the request will be given a document number that will be inputed inside the Material Master Record. Document Number will be assigned Externally.
This case is same like the Revision Level in SAP but revision level cannot support this idea.
Is there anyway i can do this?
Regards,
B. Soledad