Hi expert,
I have the following situation:
1. KIT consists of 4 produced parts (it has a BOM usage 8).
2. KIT (does not exist physically) is not Inventorized.
3. If I send partial quantity of KIT the system sends total quantity of components.
4. If I send total quantity of KIT and one of components isn't available, the system send the KIT and the other components. It doesn't block the delivery of the KIT.
Thanks in advance,
Marianna