Hi all,
We have 2 SRM systems : SRM 7.0 & 1 ECC system : ERP 6.0 (Ehp 4).
Is it possible for us to integrate these 2 SRM systems with 1 ECC in the backend?
If yes then what major settings will be required? If no what could be the reason?
Thanks,
Nikhil.