In Material Ledger, I have one material which is internally produced produced. The cost of this material last month is wrong say 20 per unit. I want it to be 4 per unit this month. As I made post closing entry for ML I willl not be able to change the cost.
I tried MR21 to change the cost but I failed. I have liquidated the material in cost center and created dummy PO at a low price. My worry is that I need the price to be 4 by the month end when I run Material ledger.