Product Costing: Overhead Cost should include in the Standard Price at the time of Receiving Goods

Sibanshu
Discoverer
0 Kudos

Hi All,

I have a requirement in which business wants to add the cost of 'special inspection' in the standard price of a finished product while receiving the material once the production is completed.

We cannot use below options:

(1) Valuated Sales Order stock

(2) Material Ledger

Kindly guide me.

Thanks in advance.

Regards

Accepted Solutions (0)

Answers (1)

Answers (1)

bhaskar_basam
Contributor
0 Kudos

You need add this 'special inspection' as additive cost in your standard cost estimate.