Hi Experts,
I have an issue on SAP_TEMSE_SPOOL_CONSISTENCY job cancelling since March 2010. Basically, when the job runs it becomes long running (573,300 sec.) and looks to be not progressing at all given that it hasnu2019t even started its first step. No SQL Commands are being executed by the job while it is running. As initial action, I tried triggering it during non-business hour to see if resource contention would be a possible cause although the job is already scheduled to run at 2300 hrs. We have temporarily disabled the job to avoid eating up more heap memory.
Checking on the trace file I saw this:
A Tue Apr 6 23:15:25 2010
A WP has reached abap/heaplimit = 52428800 bytes
The parameter adjustment would be the last option as we do not know what is the required abap/heaplimit by the job.
I checked ST02 and the memory is not exhausted.
I checked the job steps and the programs have no variants that can be tweaked.
No. Program name/command Prog. type Spool list Parameters User Lang.
1 RSTS0020 ABAP BTCADMIN EN
2 RSPO0043 ABAP BTCADMIN EN
Appreciate your input on this.
SAP ECC 6.0
Oracle: 10.2.0.4.0
OS: HP-UX 9000/800
SAP_ABA - Level 0013
SAP_BASIS - Level 0013
PI_BASIS - 0013
Edited by: Teng17 on Apr 15, 2010 11:35 AM