I have activated the change pointers for MATMAS. I changed e.g. 10 materials and created idoc for 5 materials by running BD10. How does the system know now only 5 are remaining for creating IDOC?
Also what is the best place for submitting RBDSMET as soon as user saves/creates any material using MM01/2
I found EXIT_SAPLMGMU_001, but is the material saved at this point of time?
Thanks in advance