cancel
Showing results for 
Search instead for 
Did you mean: 

Sales order BOM

Former Member
0 Kudos

Dear Expert,

How to create Sales Order BOM.of following ?

We have process FERT Halb3-halb2-halb1raw material.

Currently First we create Production order of Halb1 material used Raw Material

then create Production order of halb2 material used halb1

Halb3--halb2

Create Production order of FERT material used halb3.

in cs11 it looks like

FERT 1Ea

Halb3 1 EA

Halb2 1 EA

Halb1 1 EA

Raw 2 kg

Scrap 0.25kg-

i want to create Sales order BOM of above how to create?

Please guide me.

Thanks & Regards

Pert

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Closing

Former Member
0 Kudos

Hi ,

If you want to create Sales Order BOM,

Once all your materials are created .go to T-code CS01 Put the main material iu2014e u201CFERT u201C

Give your plant , and BOM usage as u201C5u201D Sales and Distribution

Now go to t code- (VOV7)- Select Item category :Tanu201D Get in Atu201D Bill of Material configurationu201D in Structure scopeu201D Select u201CAu201D or u201CBu201D and In Applicationu201D You select u201CSD01u201D

Now if you run Sales Order with u201CFERT material system will explode all your u201CHalb3 1 EA

Halb2 1 EA

Halb1 1 EA.

Regards,

Seegal

Former Member
0 Kudos

Hi Pert,

To create Sales BOM, TCode is CS01

Enter the following:

Material (Header Material) / Plant / BOM Usage (5 - For Sales BOM) & Valid From

Next Enter the following:

Item Category for BOM / Component (Attach Material/s)/ Quantity / UoM

Select the Line Item and Choose option Subitems and enter the following:

Installation Point (Attach Material/s) / Sub Item Qty.

Hope this information helps you

Regards

Shiva Prasad K V