Hello,
I have 2 Sloc's.
Sloc 1 and Sloc 2 are assigned to plant 123. I am trying to exclude SLoc1 from MRP.
in OMIR or SPRO>MM?CBP>Planning>Define Sloc MRP per plant i have set indicator 1 for Sloc 1.
When I run MRP, looks like this setting is not enough?
The system only excludes the location if the indicator is also maintained for the material (MARD-DISKZ) in the MRP 4 view at the plant,sloc1 level.
is this correct or I am missing something?