Former Member
Apr 13, 2010 at 08:59 AM

Error when Create Cost Estimate for Material using CK11

449 Views

Dear Experts,

I have a material ABCD which is FOC parts:-

1) Procurement type: F

2) Special procurement type: Z (at first, it was wrongly entered as B. I changed special procurement to Z & the message 'The procurement type of the special procurement type is E' displayed but I still can save & system allowed it).

3) Standard price is 0.00 as this is FOC.

Firstly, I run CK11 for material EFGH which is the parent of material ABCD.

This time, the material ABCD has special procurement type B. I received error messages:

1) No price could be determined for material ABCD in plant xyz,

2) Cost component split costed with value of zero,

3) Cost estimate for material ABCD in plant xyz is incorrect.

Then, I changed special procurement type for material ABCD from B to Z and run CK11 again. Still the same error occurred.

Could someone advise me how to run CK11 without errors.

Thanks in advance!