Skip to Content
0
Former Member
Apr 12, 2010 at 07:58 AM

Over Consumption in Subcontracting

426 Views

The subcontractor is all the time over consuming the material and we are doing adjustment in MB04.

It is decided to cancel the biz with him.

How will be recover the cost of over consumed materials in subcontracting?