Hi Gurus,
I need ur suggestion on following process,
I have one PRT material/Equipment using on one m/c lets say eg. I m using one tool on Lathe m/c & after few operations (eg. after 5000 operations) of that tool I want to remove it from respective Lathe m/c & want to use new tool for better quality o/p.
How could I do it in PM?
I thought, firstly I need to create Equipment in IE01 with resp Equip Category(eg. PRT) and assign to its Superior equipment(Lathe m/c) then assign Meas Point to PRT equip with Upper range limit is 5000 operations & once it is triggered then that material should be dismantled & Inactive from its Superior Equip.
Is it possible? Is it possible to dismantle & Inactive PRT Equip by using any User Exit or by any other way automatically?
plz put ur feedbacks on this....
Thanks in Advance...
Amol.