cancel
Showing results for 
Search instead for 
Did you mean: 

Release PR after Change

Former Member
0 Kudos

Hi Gurus,

I want to enable a functionality to release the PR after changing the existing one(Which is already released). Please let me know the configs to be done for enabling this.Thanks for your help in advance.

with regards,

Saakithyan

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Sakit,

If there is a change to the PR which redetermines a new strategy , you should get the new determination and then the PR can be released.

Thanks,

Jagruti

Former Member
0 Kudos

Hi,

Regarding the issue of re-releasing a PR/PO after it has been released and then subsequently changed, please follow the steps below.

1) SPRO --> MM --> Purchasing --> PR --> Release Procedure --> Procedure with classification --> Set up procedure with classification --> Release Indicator

2) Double click on the indicator that you use for the Release (Most of the time, it would be 2 - RFQ/purchase order)

3) Set the changeabil to 4 (Changeable, new release in case of new release strat or val change)

With the setting above, it will retrigger the release strategy. It can be retriggering the same Release Strategy or a different one, depending on the changes that you have made to PR.

However, if the change is a decrease in Value, it will not retrigger the release. Only an increase in val change will it trigger a new release strategy.

Currently, there is no way to retrigger release strategy when there is a change in value (decrease).

Hope this helps.

Answers (0)