Skip to Content
0
Former Member
Apr 10, 2010 at 01:48 PM

Data mismatch between PPDS and R3(ECC) - Help

143 Views

Hi All:

I need your help very urgently. In APO, I executed the transaction /SAPAPO/CCR. For all the PO, I chose the subset 'Not in Active Integration Model'. It then allowed me to delete it from APO, which I did. This was a big mistake and it wiped out all the POs from APO. And those are still there in R3. Now there is a complete mismatch. These are valid POs. How can I fix it?

I did the following things:

1. I created a IM for one specific material and transferred the PO, by activating the IM and executing RIMODINI. Did not work.

2. I executed the RIMODINI for the active model that is already active with that material (the enterprise active mode), thinking that it would transfer all the data once to APO. Did not work.

3. I just changed the quantity of one line item in a PO for one material and saved in R3. It did not update APO. The PO was not transferred.

Looks like I cleaned up the pointer.

I went to /SAPAPO/CCR and executed it and then clicked on the Load Results icon. I see the list of POs I deleted. But I do not know if I could anyway use them to fix my problem.

Can anyone pl. help??????