cancel
Showing results for 
Search instead for 
Did you mean: 

TP between different UOm materials

Former Member
0 Kudos

We have three shades of threads White (1413), black(9760) and grey(9631) in different unit of measurements(2500/5000/10000 MTRS). now if there is no stock in 5000mtrs threads. How can i transfer post the 2500mtrs material code physical stock to other unit material codes. PLZ help

Accepted Solutions (0)

Answers (1)

Answers (1)

sidi_reghioui
Active Contributor
0 Kudos

Hi

I don't see you have different UoM here, as all thre materials are having UoM MTRS ( which I guess will stand for metres).

Secondly, what is exactly the requirements, because it is not clear:

- do you want during sales order entry if you do not have the 5000 mtrs thread, you sell the 2500 or 10000 mtrs thread?

or

- if you dont have stock of 5000mtrs material, you transfer the stock of 2500mtrs to the stock of 5000mtrs.

Regards

Sidi

Former Member
0 Kudos

really sorry on the typo error. the UOM is cones. 2500mtrs is co1 cone, 5000mtrs is co2 etc