Former Member

confirmation

During confirmation ,a pop up is appearing Error in cost calculation or do u want error log confirmations .. like that.

Is it possible to hide or deactivate these informations..

Please help me out in this..

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

3 Answers

  • Apr 10, 2010 at 04:36 AM

    Dear,

    The error may be releated to the activity costing so please maintain the price in KP26.

    All message setting is for confirmation can be change through the OPJB.

    we can define in confirmation parameters(opk4) that an error log shoulld be displayed or

    not when an error occurs in actual cost determination check the setting for your order type and plant.

    If you don't want to cost the operation then remove the cost relevancy from OP00 of your operation control key.

    Regards,

    R.Brahmankar

    Add comment
    10|10000 characters needed characters exceeded

    • Dear,

      What is the error message you are getting there?

      Its standard SAP functionality do not change it better to correct the error setting it required to calculate the actual cost of production. If you remove the cost relevancy of control key then these message will not appear there.

  • avatar image
    Former Member
    Apr 10, 2010 at 05:13 AM

    Hi,

    It always better to get error.so that you can correct.otherwise it will affect youe costing.

    Check what error you get because normally errors are price could not found for component ( When price for component has not maintained in that case you get this error ) ,then other error may be price could not be found for activity price for xyz cost center in current period..( Activity price you can maintain in KP26 )

    In above case you always get chances to correct it

    Regards

    SANIL

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 10, 2010 at 06:39 AM

    Dear ,

    1.Goto OPK4 -Define Confirmation parameters -Select the tabe Generale Individual Entery .Please uncheked the folloiwng check box

    1.Act Costs

    2.Goods Movement

    3.Termination for Incorrect act Cost

    4.Termination for Incorrcet Goods Movement .

    2.If you do not want to cost in the operation confirmation , remove the Cost Inidcator from Operation Control Key in OPJ8 .Please note that it is not plant level set up.Operation Control key with same set up can be usede by multiple plants .

    Try and revert back

    Regards

    JH