Stock transfer between storage location with in same plant

Hi All,

what are the configuration steps for STO between storage location to storage location with in same plant.

we have one plant where abt 20 storage locations are spread over the country (USA) .

wht are different movement type

We are using ecc6.0,

Regards,

Gopala.S

Edited by: venu kk on Apr 9, 2010 11:27 AM

Add comment
10|10000 characters needed characters exceeded

  • Follow
  • Get RSS Feed

6 Answers

  • Best Answer
    avatar image
    Former Member
    Apr 09, 2010 at 09:02 AM

    Hi Venu,

    find steps for config for activating Sloc to Sloc transfer within plant using STO

    follow path: SPRO--> Materials Management -->Purchasing -->Purchase Order -->Set up Stock Transport Order -->Set Up Stock Transfer Between Storage Locations

    1. Activate Stock Transfer Between Storage Locations

    2. Assign Delivery Type and Checking Rule According to Storage Location

    purchase document category 'F' , here use PO type UB, supplying plant, issue sloc and delivery type , (prefer to create new delivery type by copying delivery type 'NL' replenish delivery

    3. Define Shipping Data for Stock Transfers Between Storage Locations

    for plant defind sales org and distribution chenal and devision

    select the pline and go to sloc

    assign there customer (created for sloc)

    4. Define Rule for Determination of Shipping Point

    for newly created delivery type set L storage location specific shiping poing determination

    5. Assign Shipping Points According to Storage Location, assign her sloc based shiping poing determination

    at last when you will create PO put issue storage location, system will determine shiping data based on config done.

    after this process will be same as STO plant to plant using shiping.

    hope this will solve your problem

    regards,

    vikas

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      I think that the error messages are very clear. Your issuing storage location is WM-managed, you need to create a pick TO and confirm it. Afterwards you'll be able to do the PGI. If you don't know what to do, ask you WM colleagues.

      I personally would use VL10B for delivery creation but I guess it's a personal preference. Apart from the fact that you do the STO within a plant, it works the same way like an intracompany STO between plant. Same movement types, too, i.e. 641 for GI and 101 for GR in case of a 2-step transfer.

      Regards,

      Attila

  • avatar image
    Former Member
    Apr 09, 2010 at 06:10 AM

    Please check this link out for details:

    sto-process-std-in-sap

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 09, 2010 at 06:21 AM

    how sto is possible with is the plant? sto is two types. one is stock transfer between plnat to plant of the same company code and second is stock transfer is between two plants of different company codes.

    you can find sto settngs at SPRO: MM > Purchasing > purcahse order > set up stock transfer order

    There is one step stock tranfer between storage location to storasge location.

    movement type 311. T code:MB1B

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Venu,

      For transfering stock from one storage location to another with in the same plant, there is no extra configuration ned to be done. You just carry out a stock transfer with t-code MB1B and movement type 311. This is a standard process and needs no configuration (except maintaining the storage locations to plant).

      The node you are talking is for stock transport order (deals with stock transfer from one plant to another, may intra-company or inter-company) and if you want use the functionality of mentioning the issuing storage location in the PO.

      Hope this clarifies your doubt.

      Regards

  • avatar image
    Former Member
    Apr 09, 2010 at 07:40 AM

    Hi Venu,

    Since the storage locations are spread over a distance, i would suggest you to use 2 step rather than 1 step transfer.

    you can do this using mtype 313 and 315.

    Thanks

    Ankit

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Apr 12, 2010 at 10:51 AM

    Hi

    It is possible to do STO, you first need to configure sto in SPRO, the same place you configure for plant there is a node define stock transport for storage location. in this assign the delivery type (NL) to doc type UB and the shipping plant. Create a STO with both shipping plant and receiving plat as same, in item level along with plant enter the receiving location. do a GI mtype 541 in mb1a, and then do a gr for this PO using 101.

    Also in condition you can add the delivery cost.

    Thanks

    Let me know if it helps.

    Ankit

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Jun 16, 2010 at 08:52 AM

    Thanks a lot guys

    i have solved my problem

    plzz check the blog for more info

    http://architectsap.com/blog/how-to-setup-stock-transport-order-between-two- storage-locations

    plzz check my blog

    Regards,