Skip to Content
0
Apr 08, 2010 at 11:37 AM

Logic needed for travel management workflow...

53 Views

Hi gurus,

Currently, I am working to modify the existing Travel management workflow to include project manager approval.

For this, I need the below:

  • Logic to determine the WBS assigned to a trip, at header level (in transaction PR05)

  • Logic to determine the WBS assigned to a trip item, at item level (in transaction PR05)

  • Logic to determine the WBS assigned to a trip, at header level (in transaction TRIP)

  • Logic to determine the WBS assigned to a trip item, at item level (in transaction TRIP)

Please let me know about this soon.

Thanks.

Sukumar.