Hi gurus,
Currently, I am working to modify the existing Travel management workflow to include project manager approval.
For this, I need the below:
Logic to determine the WBS assigned to a trip, at header level (in transaction PR05)
Logic to determine the WBS assigned to a trip item, at item level (in transaction PR05)
Logic to determine the WBS assigned to a trip, at header level (in transaction TRIP)
Logic to determine the WBS assigned to a trip item, at item level (in transaction TRIP)
Please let me know about this soon.
Thanks.
Sukumar.