cancel
Showing results for 
Search instead for 
Did you mean: 

subcontracting & STO for Delivery

former_member216664
Participant
0 Kudos

Hi MM Consultant

Pls tell me the process of below given questions .

1 ) How is scrap accounted in subcontracting?

2) How to configure Stock Transport Order with Delivery , pls give me step by step process

regards

Anubhav

Accepted Solutions (1)

Accepted Solutions (1)

former_member225662
Active Contributor
0 Kudos

HI,

1. Check the link for scapp accounted in subcontracting

http://www.allinterview.com/showanswers/57825.html

2. Check the link for STO with delivery config

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c05e2251-91f0-2c10-4e91-e919468e4...

Regards

KK

Edited by: Kishore Kumar Galla on Apr 5, 2010 5:52 PM

former_member216664
Participant
0 Kudos

hi Kishore

thanks for reply

1) if i dont use BOM then how it will it will account.

2) for STO pls tell me the movement type 643 or 641

Answers (2)

Answers (2)

Former Member
0 Kudos

In subcontracting, if you are refering to component scrap, you can maintain the scrap value as a percentage in the component details. This works the same way as a production BOM with scrap

Former Member
0 Kudos

hi anubhav,

when u talk abt scrap in subcontracting, it is actually same as the co-product.

when u maintain the item cat. as "L" it wll ask for the components, there u maintain the scrap quantity with negative sign.

rest all procedure is same.

and when u ask abt the difference in the mvt typ 641 and 643

641 is the Stock transfer order 1 step movement where u need not do MIGO in the recieving plant.

643 is actually the STO b/w 2 different company codes with shipping.

hope it helps u

Regards,

yk