on 04-05-2010 1:16 PM
Hi MM Consultant
Pls tell me the process of below given questions .
1 ) How is scrap accounted in subcontracting?
2) How to configure Stock Transport Order with Delivery , pls give me step by step process
regards
Anubhav
HI,
1. Check the link for scapp accounted in subcontracting
http://www.allinterview.com/showanswers/57825.html
2. Check the link for STO with delivery config
Regards
KK
Edited by: Kishore Kumar Galla on Apr 5, 2010 5:52 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In subcontracting, if you are refering to component scrap, you can maintain the scrap value as a percentage in the component details. This works the same way as a production BOM with scrap
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi anubhav,
when u talk abt scrap in subcontracting, it is actually same as the co-product.
when u maintain the item cat. as "L" it wll ask for the components, there u maintain the scrap quantity with negative sign.
rest all procedure is same.
and when u ask abt the difference in the mvt typ 641 and 643
641 is the Stock transfer order 1 step movement where u need not do MIGO in the recieving plant.
643 is actually the STO b/w 2 different company codes with shipping.
hope it helps u
Regards,
yk
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.