We have an issue regarding the GR.
PO has 2 line items. Item 10 was checked and released by GTS. Item 20 is checked and blocked by GTS.
However when I am doing the GR for item 10 (MIGO/MB01), GTS is blocking the document for processing. How can I solve this issue?
Thanks,
Bhavesh