using CharM while still using manual release management

98 Views

Hi,

I am implementing ChaRM in different countries.

We have 1 Global Development System and 1 system from which Charm is connected through RFC to the Global system.

The transport routes and clients stay the same after the implementation.

Is it possible to implement ChaRM which is connected to the Global system for 1 country while the other countries still use the old release management system?

Is it possible to still do the leftover manual transports while using ChaRM?

Thank you for the answer.