Hi group members,

I am not able to transport the assigned cost center to splitting structure using OKE6 from Dev. to quality instance.

I am doing cost center splitting (OKES,OKEW) and want to assign cost centers to splitting structure.(OKEW).

I have done this in Dev. server but am not able to transport this to quality server for testing

Can you suggest the exact tab,field i need to select to transport the assignment of cost center to splitting structure.

if there is another way to transport the setting, pl let me know

Regards,

Sangarsh

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

problem resolved

Thanks for the help

Former Member
0 Kudos

Hi Sangarsh,

How do you resolve this in the end?

Please share the steps.

Thanks.

Best Rgds,

Sebastian

iklovski
Active Contributor
0 Kudos

Hi,

Try this: Go to OKES, Menu - Table View - Transport.

Regards,

Eli

Former Member
0 Kudos

Hi Eli,

OKES is not the problem

That is transported

OKEW - assignment of cost center to splitting structure is the issue.

it is not getting transported and there is no mene table view- transport.

can you guide.

Regards,

Sangarsh

iklovski
Active Contributor
0 Kudos

Hi,

Please, check note 406827 for explanations.

Regards,

Eli

Former Member
0 Kudos

Hi Eli

as given in note suggested by you,

'When you assign the cost centers to the structure in the original system

the respective cost centers are determined directly. These are stored in

table COSC. Only those entries stored in this table are included the

transport request. Consequently assigning the cost centers to the splitting

structure is a static process.

In the target system the assigned group or interval contains more cost

centers than in the original system. These cost centers cannot be assigned

to the splitting structure in the target system because the assignment was

made in the original system in which either the cost centers are not

assigned to the group or do not exist.'

I have checked the COSC table and in my case the cost centers are present there.

Also the no of cost centers in dev and quality server are the same.

can you guide why these are not included in the request.

do i need to make okew a current setting and assign cost center to the structure?

Regards,