Hi Gurus,

I need to assign 2 inspection plans to a material, to be used in goods receipt inspection, and 2 inspection lots to be created upon the goods receipt.

When I tried it, I got one inspection lot with no inspection plans assigned....and this is very logical.

But I still need to create the 2 inspection lots...it is a critical customer requirement.

How can I resolve this???

Regards,

MaX

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

4 Answers

  • avatar image
    Former Member
    Mar 30, 2010 at 01:41 PM

    I guess I didn't clarify well, here is the example.

    I have 2 inspection plans for goods receipt for the same material, one is for the chemical analysis, and the other is for the microbiological analysis.

    I need when I receive the goods, 2 inspection lots are created AUTOMATICALLY for the material, one lot for the chemical test and the other for the microbiological.

    Hope that I clarified it.

    Regards,

    MaX

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Dear MAX,

      I think that in this case the best solution is have 1 inspection plan with 2 operation.

      If the laboratory that make chemical & microbiologic test are different, you can assign different work centre to the operation.

      If you want, i.e., use the stock after chemical control because microbiologic take more time, you can use short term characteristic for chemical operation and long term characteristic for microbiologic operation, in order that you can take usage decision and insert microbiologic result in a second time.

      If you are managing sample, you can use partial sample differently for any operation.

      Let me know.

      Regards, Alby

  • avatar image
    Former Member
    Mar 30, 2010 at 10:15 AM

    Dear Max

    I am not clear about your requirement. I understood that you want to create the two inspection lots for single material. One is after creation GR & another when do you want to create?

    Please specify more details of the requirement.

    Regards

    Makarand Gurjar

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Mar 30, 2010 at 10:45 AM

    Kindly explore your business requirement

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Mar 30, 2010 at 11:06 AM

    Hi,

    You can craete 2 lots at the time GRN .

    In material master MM02 Change material ---Qm view in inspection type set up ( choose inspection type set up that you are using if GRN from production then 04 or raw material 01 )

    In inspection set up in ctrl insp lot -you have 5 option ( normally by default system takes 1st option each material document ) but for your requirement you select Each material,batch,storage location or each order item ,batch ,storage location Or also can try 2nd option.

    Then whenever you do GRN different lot will get genarated.

    Then you can choose your require plan for result record.

    In above case foe each order you have to do GRN of same order seperatly.

    Just check for any further clarification revert me back.

    Regards

    SANIL

    Hi sorry I understood it wrongly.

    Please Ignore above reply.

    You can do simply GRN for same order in split qty seperatly. say 50.0 KG each time then you will get 2 lots for same.

    Regards

    SANIL

    Edited by: Sanil Vadke on Mar 30, 2010 1:12 PM