Hello,
I always have to assign components form a BOM to an operation in the routing and I have some problems.
If the components from a BOM are not manually assigned to an operation, SAP automatically assigns them to the first operation. I want to assign them to another operation and sometimes, because of an oversight, I forget it. I want to know if there is an easy way to control if components are assigned to an operation or not.
Regards
Laura