Hi ,

expert,

I m maintaining relationship with Cost center to multiple Organization unit . in infotype 1001.

Means

Cost centre X & Org.Unit A B & C

X -


> A date required is 1999 to 31.12.9999

X-------> B date required is 1999 to 31.12. 9999

X -


> C. date required is 1999 to 31.12.9999

but if i m doing like this system delimiting to this and not allowing to do this .

but if i change date means 1999 to 31.12.9999 for A

2000 to 31.12.9999 for B

system accepting it .

please tell me , how can i solve it.