I am looking for some documentation regarding migration projects. In particular:

  • Roadmap of a migration project.

  • Main aspects when planning a migration project.

  • Best practices.

  • Which are the parameters to consider in order to estimate time, resources, and so on.

As you see, the query is more related to the plannig point of view than technical point of view(how to use the tool).

Thanks, in advance for your help.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Mar 25, 2010 at 04:22 AM

    This message was moderated.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 13, 2010 at 01:42 AM

    Hi

    Not sure how easily documentation from previous/other projects can be adapted to your specific scenario.

    I've been involved in many IS-U migration projects over the last decade and they were all completely different from each other, starting with the number of customer/accounts (from 100,000 to 18,000,000), the number of different scenarios (single/multi division, low/high meter complexities, meterread, billing and financial history), with/without auxiliary systems (like CRM, BI)... this makes the job so interesting over such a long period 😊

    Here some tips:

    • Start early in the project with the migration design and development, even without all the functional requirements available

    • Keep it flexible, there will always be changes from a functional point of view (almost certainly when you want to have a code freeze)

    • Testing, testing, testing. I've never loaded a single object without a previous test (and over time we're talking billions of objects)

    • One person/developer should not handle more than two to four migration objects, dependent on the complexity

    Yep

    Jürgen

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 18, 2015 at 04:46 AM

    I am looking for some training materials for EMIGALL. I read Friedrich Keller's training documentation and can do ISMW/EMigall data reports and imports... but I am stuck at one point... the EMIGALL import file, can it reside on the SAP server, or local machine, or both? How is this configured/ ? Thanks.

    Any standard SAP course teaching EMIGALL?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 20, 2015 at 08:23 PM

    There's a Data Transfer class - BC420 that covers BDC, LSMW etc, but it has no EMIGALL content, it being such a utility specific tool. I did BC420 a few years ago and the instructor hadn't even heard of EMIGALL.😉

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear Astrid,

      Yes I agree, BC420 does not cover any aspect of the ISMW and it is not a big surprise that the ISMW (TxA EMIGALL) is not well known outside of the IS-U space.

      However, and I beg your pardon for this, I'd like to complete your statement saying that the ISMW is not only a utility specific migration tool but a data load/migration tool for various FI-CA based industry solutions, sich as IS-U, FS-CD, IS-T, PS-CD ...

      Cheers,

      Fritz

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.