Skip to Content
0
Former Member
Mar 24, 2010 at 07:21 AM

Delta

10 Views

Hi,

We have just connect the new BW Test System (copy for Production BW) onto ECC6 Test system. This BW Test is never connected to the ECC6 Test system before, this is the first time. In the BW, the Delta Init have already exist for Datasource 2LIS_11_VAHDR and 0CO_OM_OPA_6 (in fact for all the Delta Datasource) because this is the copy of Production BW. I can see it via InfoPackage ->Sceduler ->Initialization Option for Source System.

Question:

Because this is the first time we connect BW Test to ECC6 Test, I should:

1) Delete the existing Initialization via InfoPackage ->Sceduler ->Initialization Option for Source System

2) Create new InfoPackage, select option Initialize Delta Process + Initialize Without Data

3) And load this Request to the Data Target

With this, I can load the Delta from ECC6 Test System to BW Test System.

Correct?

Please advise, thanks.