Skip to Content
0
Mar 22, 2010 at 07:29 AM

Linkage of inspection lot when the stock is posted to new material in UD.

43 Views

Dear QM Gurus,

My client has the following requirement.

The stock is sometimes posted to the new material whle Usage decision(Partially or completely)

In this case the target material has no linkage with the inspection lot of the material for which the Usage decision is done.

The user has to manually create the inspection lot for the target material and record the same results once again for the record purpose.

The requirement is to establish a link between the inspection lot original material and the target material so that the additional step of creating the manual inspection lot and result recording can be avoided.

Is there any standard functionality through which I can link the inspection lot/result recorded to the target material or can it be acieved through some enhance ments.

Please help.

Regards

Ankush