Hi,
Recently my client is changing their cost center number from 6char to 5 char format. I have created customized mapping table to link between old cost center number and new ones.
Create new cost center referencing to old cost center is done too.
However, for each Personnel Number, i need to change the cost center assignment which link to org unit. I have done this too manually at t-code PPOM. How can I do this for mass change? I have a list of org unit number with me. Is there any standard program to do this or i should use LSMW ?
How do I make sure for each Personnel number, their cost center assignment will change to new 5 char format in the end as required?
I am new to HR module.
Thank you for your help.
Try to Change thru LSMW for the tcode PP01 pp02 or Po10
As the cost center is assigned to the Orgunit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
As Sikandar said, you will have to write an LSMW or BDC ( where in you can check and validate the input Cost centers) using PP01 or Po10.
Also I think if you use BDC or LSMW you will have to run the RHINTE30 report. Check the documentation on RHINTEXX reports to get better idea.
Cheers..
Ajay