Former Member

Error Message: Number is not in external Interval (Testing Schedule)

Hii ,

Iam working on Stability study process. I have maintained stabity test with materiial (QS) & performed my test upto Initial test of Inspection lot. But when i click create Testing Scheudle in the Notification (QM02) , system asks for testing schedule data for

Maintenane strategy, scheduling period.

On clciking create testing schedule , system throws error message "Number is not in external interval". I have maintained all the prerequite setting on number range in following spro path stability study >testing schedule for stability study > Category--> no range.

For Group ST 600000000- 6999999999 for Intenal & 70000000-7999999999 for external. But still iam facing with error message ""Number is not in external interval". It throws message no "IP324" . Even I had cross checked with maintenance setting, but error message remains . How to resolve this issue?

with regards,

K.Lokesh.

Edited by: Lokesh K on Mar 11, 2010 1:13 PM

Edited by: Lokesh K on Mar 12, 2010 5:55 AM

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Apr 12, 2010 at 01:47 PM

    Hi Lokesh,

    did you actually enter a number ( i.e. 70000001)?

    Usually Stability studies are created using the external number range so that ringing names can be used for the studies:

    Example:

    Material: 000000000000000001 acetylsalicylic acid

    Stability study: ASA1

    I hope that this information proves usefull.

    Regards

    Isabelle