Usage Decision

15 Views

Dear Friends,

For a material, GR is performed for qty 1000 and the stock is now shown under Quality Inspection and the Inspection lot is generated in QA32. If suppose, I have cleared all the stock through usage decision to unrestricted stock. And after that, If I need to reverse the document and re-assign the stock to Unrestricted as well as blocked in Usage decision. Then, is this scenario possible?

Please provide me a solution for this. If I am canceling the document through MBST, system is throwing an error message that Material document cannot be processed.