Hi,

When we create a Product Cost Collector (PCC) for a material for the first time, we can choose at which controlling level this PCC is created (Production version or BOM/routing or Production Plant/Planning Plant).

However when we delete this PCC and try to create a new PCC for the same material, we have no option for choosing the controlling level. The choice options are grey and the new PCC can only be created at the same controlling level as the previously deleted PCC.

We use transaction KKF6N.

Could anybody advice us, how to change the controlling level for a material?

Best regards,

Marcin

Edited by: Marcin Kaiser on Mar 9, 2010 1:13 PM