hi all,

i have maintained the material master

also do the config of cost componenet structure

but while i run ck11n i waont able to see any cost

can somebody tail me the prerequsite to get the standard cost estimate

form the pp side the settings are ok by pp consultant

i want to see form co side what need to be done

Edited by: john san on Mar 8, 2010 8:33 AM

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member604117
Participant
0 Kudos

thanks

former_member604117
Participant
0 Kudos

Dear all,

i need to understand how the quantity based overhead applied to product cosing in config

how the cost element debit to cost ceneter

how it links with PP module .

Former Member
0 Kudos

Hi,

do you get any error messages while doing the costing?

You need to have the price defined for the cost centers/activity types (KP26) used within the routing.

in the valuation variant, which is assigned to the cost variant (OKKN), check how are the materials(components) valuated...strategy sequence, and check also the strategy sequence for activity types.

Ensure, that based on these strategy sequencies some values can be found for acitivity types and materials.

Regards

Peter

Former Member
0 Kudos

Hi,

Check costing sheet and cost compnenet structure for plant and also check costing variant.

Regards,

Sreekanth