on 03-08-2010 7:20 AM
hi all,
i have maintained the material master
also do the config of cost componenet structure
but while i run ck11n i waont able to see any cost
can somebody tail me the prerequsite to get the standard cost estimate
form the pp side the settings are ok by pp consultant
i want to see form co side what need to be done
Edited by: john san on Mar 8, 2010 8:33 AM
thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear all,
i need to understand how the quantity based overhead applied to product cosing in config
how the cost element debit to cost ceneter
how it links with PP module .
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
do you get any error messages while doing the costing?
You need to have the price defined for the cost centers/activity types (KP26) used within the routing.
in the valuation variant, which is assigned to the cost variant (OKKN), check how are the materials(components) valuated...strategy sequence, and check also the strategy sequence for activity types.
Ensure, that based on these strategy sequencies some values can be found for acitivity types and materials.
Regards
Peter
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check costing sheet and cost compnenet structure for plant and also check costing variant.
Regards,
Sreekanth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.