Skip to Content
0
Former Member
Mar 05, 2010 at 03:45 PM

Stability study

69 Views

Hi guys,

I'm working with stability study and I have an issue:

I assigned a maintenance strategy to inspect each month for a year, I have 3 operations in the inspection plan, for the first 2 operations I will inspect every month, and I have no problem with this, for the 3rd operation I need to inspect every 3 months.

How can I make this?

Regards,

MaX