Problems with dayu00B4s supply in MD06

20 Views

Hi,

I have a problem with transaction MD06:

For the material A, the stock level is 0 (zero) for today´s date (2nd of March 2010).

I do have a planned independent requirement (VSF) of 56 for the 1st of March 2010.

MRP date is 1st of March 2010.

The range of coverage is calculated to 999 days even though stock level is zero...

Why is the system still showing Range of coverage (days supply) to 999 days? Is there anyone out there who experienced a similar problem?

Thanks,

Lars