Material consumption in a MIC or IP

How can i plan my material consumption for QI i a specific MIC?

For example I want to add (and MRP-plan) a "quality-material" (ex. expensive sterile one-use-equipmet or chemical ) without link this material to the inspected material BOM.

Edited by: Andreas Larsson on Feb 26, 2010 11:23 AM

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Best Answer
    avatar image
    Former Member
    Mar 01, 2010 at 12:09 PM

    You can think of the other ways of planning the material using consumption based planning.

    also you can use QM orders to show your consumption.

    this can be a common order for a plant or you can also create different QM orders and assign them to the material master QM view and post consumption against the same.

    Hope this helps

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Feb 26, 2010 at 10:50 AM

    Generate the unplanned requirement with storage location like Qurantine storage location.

    Add comment
    10|10000 characters needed characters exceeded

    • You can assign PRT's to a MIC but I can't honestly remember for sure if you actually consume an item via them. I don't think you can.

      The only thing I can suggest is a follow-up action on the UD that does the stock reduction for you. Of course you'd have to include all the code to check the MIC's and figure out exactly the material to be consumed for that MIC. You might be able to store a material number into one of the info fields of the MIC.