PR and PO creation in ECC from SRM 7.0

12 Views

Hi everyone,

I have a pair of doubt. We are planning to upgrade SRM 3.0 to SRM 7.0 with ECC 6.0 ep 4 in a classic scenario. My doubts are:

1.- Can we create a PR from a SC using PI by standard or is the same as the previous version (using RFC)??

2.- Can we create a PO from a SC using PI by standard or is the same as the previous version (using RFC)??

3.- We checked the documentation and there is a different type of contract, the central contract. This contract can be transfer to ECC?? if yes, is it transferred using PI??

Thanks,

Ivá